Short answer
There is no single lead time for custom caps. The schedule depends on construction, fabric, decoration, quantity, sample approval, inspection and transit. It is confirmed for the actual order, not promised as a generic number.
Plan backwards from the delivery date
Start with the date the caps must be in your warehouse or with your customer. Work backwards through transit, customs, inspection, bulk production, sample approval and artwork. A workable plan leaves time for one sample revision and one document correction; a plan with no buffer is fragile.
What usually takes the time
New fabric or custom colours, new embroidery programs, patch moulds, licensed artwork approval, mixed size runs, retail packaging and peak-season capacity are common drivers. An existing construction with available materials is faster than a new build, but the factory still confirms the schedule against the actual quantity.
What to confirm in writing
Confirm the sample date, bulk start date, ex-factory date, inspection date, shipping mode and the owner of each approval. Ask what happens if artwork or labels arrive late. A production schedule is useful only when it names dates and dependencies, not just a number of days.
FAQ
Can you guarantee a delivery date?
We confirm a production and shipping plan against the approved specification. Transit and customs are outside a factory guarantee; use the agreed Incoterm and a buffer.
Does a larger order always take longer?
Not automatically. Materials, decoration and line capacity matter more than quantity alone. The schedule is confirmed after review.
When should I book shipping?
After the ex-factory date and inspection plan are confirmed. Do not book non-refundable freight against an unapproved sample.